
{"id":49,"date":"2012-10-10T13:42:05","date_gmt":"2012-10-10T13:42:05","guid":{"rendered":"http:\/\/www.qcmywebsite.com\/fluid\/?page_id=49"},"modified":"2025-01-16T18:29:42","modified_gmt":"2025-01-16T22:29:42","slug":"what-is-a-pde-study","status":"publish","type":"page","link":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/what-is-a-pde-study\/","title":{"rendered":"What is a PD&#038;E Study?"},"content":{"rendered":"<p>As shown in the graphic below, the Gibsonton Drive project has completed the<strong> PD&amp;E Study phase<\/strong> of the FDOT\u2019s 5-step transportation project development process. A PD&amp;E Study is the FDOT\u2019s process for adhering to the National Environmental Policy Act (NEPA) and involves a range of engineering and environmental analyses and public involvement.<\/p>\n<p>A PD&amp;E study assists the FDOT Office of Environmental Management (OEM) to determine the location; conceptual design; social and economic, cultural, natural and physical environmental effects of the proposed project. During the PD&amp;E Study, \u201cBuild\u201d alternatives are developed and evaluated based on safety measures, environmental and engineering analyses, and public input. In addition, the \u201cNo Build\u201d alternative remains a viable option throughout the PD&amp;E Study phase.<\/p>\n<p>If the study results in a \u201cBuild\u201d alternative being selected, and funding is available, the project may proceed to the design phase.<\/p>\n<h2>Five Steps in the Transportation Development Process<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full\" src=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/themes\/d7studies_active\/images\/pde_process_graphic.jpg\" alt=\"The Transportation Development Process\" width=\"207\" height=\"385\" \/><\/p>\n<ol>\n<li><strong>Long Range Planning:<\/strong> The FDOT and local agencies conduct long-range transportation planning on an ongoing basis to identify and prioritize projects.<\/li>\n<li><strong>Project Development and Environment Study:<\/strong> As described above, the PD&amp;E Study phase involves conceptual engineering, environmental evaluations, and public involvement. It is during this phase that alternatives are evaluated; if a \u201cBuild\u201d alternative is selected, and funding is available, the project would move into the design phase.<\/li>\n<li><strong>Design:<\/strong> During the design phase, construction plans are prepared.<\/li>\n<li><strong>Right-Of-Way Acquisition:<\/strong> This phase entails the purchase and acquisition of right-of-way, if needed.<\/li>\n<li><strong>Construction:<\/strong> The roadway is built during this phase.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As shown in the graphic below, the Gibsonton Drive project has completed the PD&amp;E Study phase of the FDOT\u2019s 5-step transportation project development process. A PD&amp;E Study is the FDOT\u2019s process for adhering to the National Environmental Policy Act (NEPA)<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/what-is-a-pde-study\/\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/pages\/49"}],"collection":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/comments?post=49"}],"version-history":[{"count":9,"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/pages\/49\/revisions"}],"predecessor-version":[{"id":1397,"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/pages\/49\/revisions\/1397"}],"wp:attachment":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/media?parent=49"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}