
{"id":64,"date":"2012-10-10T14:34:00","date_gmt":"2012-10-10T14:34:00","guid":{"rendered":"http:\/\/www.qcmywebsite.com\/fluid\/?page_id=64"},"modified":"2025-01-16T19:34:43","modified_gmt":"2025-01-16T23:34:43","slug":"project-details","status":"publish","type":"page","link":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/project-details\/","title":{"rendered":"Project Details"},"content":{"rendered":"<!-- Added by Post\/Page Specific Custom Code plugin, thank you for using! -->\n<style>img.pref-typ-sec {\r\npadding: 10px 10px 20px;\r\nbackground: #fff;\r\nmargin-top:30px;\r\n}<\/style>\n<div style=\"background-color: #fff; padding: 30px; border: solid 5px #d15600; margin: 20px auto; border-radius: 6px; text-align: center;display:none;\">\n<p style=\"margin-top: 0\" data-uw-styling-context=\"true\">The Florida Department of Transportation (FDOT) District Seven, in coordination with Hillsborough County, held a <strong style=\"color: #d15600\">Public Hearing<\/strong> for the <strong style=\"color: #d15600\">Gibsonton Drive Project Development and Environment (PD&#038;E) Study<\/strong> on<br \/> <strong style=\"color: #d15600;\">February 20, 2024 from 5:30 p.m. to 7:30 p.m.<\/strong> at:<\/p>\n<p style=\"margin-top: 15px\"><a href=\"https:\/\/maps.app.goo.gl\/Hj14daUNeQQKv458A\">Riverview Public Library<br \/>9951 Balm Riverview Road<br \/>Riverview, FL 33569<\/a><\/p>\n<p>Visit the <a href=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/public-involvement\/public-hearing\/\">Public Hearing page<\/a> to view information presented at this meeting.<\/p>\n<p style=\"margin-top: 15px;display:none;\">If you would like to attend virtually via GoToWebinar, please register using this link:<br \/><a href=\"https:\/\/attendee.gotowebinar.com\/register\/4415333468707341402\" target=\"_blank\" rel=\"noopener\">https:\/\/attendee.gotowebinar.com\/register\/4415333468707341402<\/a><\/p>\n<\/div>\n<div class=\"banner-link\" style=\"margin-top: 20px;background-color: #d15600;color: #ffffff;text-align: center;display:none;\">\n<p style=\"margin: 0;padding: 20px;color: inherit\">On <strong style=\"color: #ffc866\">November 21, 2024<\/strong> FDOT and FDOT\u2019s Office of Environmental Management (OEM) pursuant to 23 U.S.C. 327 and a Memorandum of Understanding (MOU) dated December 14, 2016 and executed by Federal Highway Administration (FHWA) and FDOT, granted Location Design Concept Acceptance for the Gibsonton Drive Project Development and Environment (PD&amp;E) Study from Fern Hill Drive to US 301.<\/p>\n<p style=\"padding: 15px;margin-top:0\">Please <a style=\"color: #ffc866;font-weight: 700\" href=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/project-final-documents\/\">click here<\/a> to see the Final Project Documents and approved concept plans.<\/p>\n<\/div>\n<div class=\"alignright\">\n<div class=\"project-overview-map\">\n<div class=\"project-overview-map-wrapper\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/project-location-map.png\" rel=\"fancybox\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-1099\" style=\"border: 0 none;\" src=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/project-location-map.png\" alt=\"Project Location Map\" width=\"400\" height=\"301\" \/><\/a><\/div>\n<div class=\"project-overview-caption\">click image to view map<\/div>\n<\/div>\n<\/div>\n<p>The Florida Department of Transportation (FDOT) District Seven, in coordination with Hillsborough County, conducted a Project Development &amp; Environment (PD&amp;E) study along Gibsonton Drive from Fern Hill Drive to US 301 in Hillsborough County.<\/p>\n<h2>PD&amp;E Study Purpose<\/h2>\n<p>The objective of the PD&amp;E study was to assist the FDOT Office of Environmental Management (OEM) in reaching a decision on the location; conceptual design; social and economic, cultural, natural and physical environmental effects of the proposed improvements for the widening of Gibsonton Drive, including stormwater management facilities (SMF) and floodplain compensation (FPC) sites. This study documents the need for the improvements as well as the procedures utilized to develop and evaluate various improvements, including elements such as proposed typical sections, preliminary horizontal alignments, and intersection enhancements.<\/p>\n<p>The PD&amp;E study satisfies all applicable requirements, including the National Environmental Policy Act (NEPA), to qualify for federal-aid funding of subsequent development phases (design, right of way acquisition, and construction). This project was screened through the FDOT\u2019s Efficient Transportation Decision Making (ETDM) process as ETDM Project No. 14493. The ETDM Programming Screen Summary Report was published on August 17, 2022, containing comments from the Environmental Technical Advisory Team (ETAT) on the project\u2019s effects on various natural, physical, and social resources. A Type 2 Categorical Exclusion is the class of action for this PD&amp;E study.<\/p>\n<h2>Project Purpose and Need<\/h2>\n<p>The purpose of this project is to address future roadway capacity issues as well as improve safety conditions on Gibsonton Road, which is an important east-west connection between I-75 and US 301.<\/p>\n<p>This project is needed to accommodate traffic volumes for the future year (2045) and to accommodate projected traffic flows from the proposed reconstruction of the I-75\/Gibsonton Drive interchange. Additionally, this segment experiences high crash rates that are more than six times the statewide average for similar facilities.<\/p>\n<h2>Existing Facility and Proposed Improvements<\/h2>\n<p>Gibsonton Drive is owned and maintained by Hillsborough County. Within the project area, Gibsonton Drive is currently a four-lane divided facility functionally classified as an arterial roadway with a posted speed limit of 45 mph. The roadway has two 12-foot lanes in each direction, a 22-foot median and turn lanes at many locations along the corridor. There are approximately 4-foot paved shoulders throughout the corridor with no dedicated bicycle lanes. There is a 5-foot sidewalk on both sides of the road with a few gaps in the sidewalk on the south side, west of Hagadorn Road\/Kenda Drive. Approximately 230 linear feet of the sidewalk on the south side, east of Hagadorn Road\/Kenda Drive, is a wood boardwalk. The existing right of way (ROW) varies along the corridor, but is a minimum of 120 feet.<\/p>\n<p>The proposed improvements include widening the existing four-lane divided urban arterial from Fern Hill Drive to US 301 to a six-lane divided urban arterial with a 22-foot median. There will be two 11-foot and one 12-foot travel lanes with curb and gutter with a 10-foot wide sidewalk in each direction. Horizontal widening alignments were adjusted to minimize right-of-way requirements, impacts and costs. <\/p>\n<p>Up to 30 feet of additional right-of-way is required along the north side of the roadway between Hagadorn Road and US 301 and up to 7 feet of additional right-of-way is needed on the south side of Gibsonton Drive just west of the US 301 intersection. Additional right-of-way is proposed for one off-site stormwater management facility and one off-site floodplain compensation site which are located adjacent to Gibsonton Drive.<\/p>\n<div id=\"attachment_1411\" style=\"width: 3738px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/Fig1-2_PrefTypical.jpg\" rel=\"fancybox\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1411\" src=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/Fig1-2_PrefTypical.jpg\" alt=\"Preferred Typical Section\" width=\"3728\" height=\"1238\" class=\"size-full wp-image-1411 pref-typ-sec\" srcset=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/Fig1-2_PrefTypical.jpg 3728w, https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/Fig1-2_PrefTypical-300x100.jpg 300w, https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/Fig1-2_PrefTypical-1024x340.jpg 1024w, https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/Fig1-2_PrefTypical-768x255.jpg 768w, https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/Fig1-2_PrefTypical-1536x510.jpg 1536w, https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-content\/uploads\/sites\/126\/Fig1-2_PrefTypical-2048x680.jpg 2048w\" sizes=\"(max-width: 3728px) 100vw, 3728px\" \/><\/a><p id=\"caption-attachment-1411\" class=\"wp-caption-text\">Preferred Typical Section<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Florida Department of Transportation (FDOT) District Seven, in coordination with Hillsborough County, held a Public Hearing for the Gibsonton Drive Project Development and Environment (PD&#038;E) Study on February 20, 2024 from 5:30 p.m. to 7:30 p.m. at: Riverview Public<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/project-details\/\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/pages\/64"}],"collection":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/comments?post=64"}],"version-history":[{"count":35,"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/pages\/64\/revisions"}],"predecessor-version":[{"id":1415,"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/pages\/64\/revisions\/1415"}],"wp:attachment":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/gibsonton-dr-fern-hill-to-us301\/wp-json\/wp\/v2\/media?parent=64"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}