
{"id":88,"date":"2012-10-10T14:52:42","date_gmt":"2012-10-10T14:52:42","guid":{"rendered":"http:\/\/www.qcmywebsite.com\/fluid\/?page_id=88"},"modified":"2023-05-03T10:48:19","modified_gmt":"2023-05-03T14:48:19","slug":"public-hearing","status":"publish","type":"page","link":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/public-involvement\/public-hearing\/","title":{"rendered":"Public Hearing"},"content":{"rendered":"<p>The Florida Department of Transportation (FDOT) conducted a public hearing regarding the <strong>State Road 50 (US 98\/Cortez Boulevard) Project Development &amp; Environment (PD&amp;E) Study.<\/strong><\/p>\n<p>The public hearing was held on Tuesday, <strong>December 10, 2019<\/strong> at the Brooksville Wesleyan Church, 22319 Cortez Boulevard, Brooksville, Florida 34601. The public hearing began as an open house at 5:30 p.m., with a formal presentation at 6:30 p.m., followed by a public comment period.<\/p>\n<p>This public hearing was conducted to present information and receive public input regarding the proposed improvement to SR 50. The information regarding the study was on display for review at the public hearing.<\/p>\n<p>Project materials including maps and project reports were available for review and FDOT representatives were also present to answer questions prior to and following the formal portion at the hearing. Interested parties may submit written comments at a later date to: <strong>Kirk Bogen, P.E., Environmental Management Engineer, FDOT District Seven, 11201 N. McKinley Drive, MS 7-500, Tampa, FL 33612.<\/strong> Written comments were accepted throughout the PD&amp;E study, and had to be received by <strong>December 23, 2019<\/strong> to be included in the public hearing record.<\/p>\n<p>Project documents were available for review from <strong>November 19, 2019 \u2013 December 23, 2019<\/strong> at the following locations:<\/p>\n<p>East Hernando Branch Library<br \/>\n6457 Windermere Road<br \/>\nBrooksville, FL 34602<br \/>\n(352) 754-4043<\/p>\n<p>FDOT District Seven<br \/>\n11201 N. McKinley Drive<br \/>\nTampa, FL 33612<\/p>\n<p><!--Public participation was solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act of persons who required translation service (free of charge) were to contact <strong>Alex Henry, Public Involvement Coordinator, at (813) 975-6405 or (800) 226-7220 at least seven (7) working days in advance of the hearing.<\/strong>\n\nFor more information, please contact\u00a0<b>Amber Russo, P.E., FDOT Project Manager <\/b>at<b> (813) 975-6260<\/b>\u00a0or <b><a href=\"mailto:amber.russo@dot.state.fl.us\">amber.russo@dot.state.fl.us<\/a><\/b><b>.<\/b>--><\/p>\n<p>Project information and documents were uploaded to the <a href=\"https:\/\/fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/public-involvement\/project-documents\/\">project documents page<\/a> for review.<\/p>\n<p>Please check back to this page periodically for current information regarding meeting schedules, meeting displays and graphics.<\/p>\n<h2 style=\"background-color: #b24800; color: #fff; padding: 15px;\">Public Hearing Materials<\/h2>\n<h3>Presentation<\/h3>\n<div class=\"info-box download\" style=\"margin-bottom: 0;\">\n<p><video style=\"border: solid 1px #d5d5d5; max-width: 100%;\" poster=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/117\/video\/poster.jpg\" controls=\"controls\" width=\"100%\" height=\"auto\">Your browser does not support the <code>video<\/code> element.<\/video><\/p>\n<p style=\"text-align: center;\">Public Hearing Presentation<\/p>\n<p style=\"text-align: center;\"><a class=\"button\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/117\/video\/SR_50_PublicHearing_Pres_20191210_Web.mp4\"><i class=\"fa fa-video-camera\" style=\"padding-right: 5px;\"><\/i>download presentation video<\/a><\/p>\n<\/div>\n<h3>Roll Plots<\/h3>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/RollPlot2_Sheet1sm_01.pdf\" rel=\"noopener noreferrer\">Roll Plot 1 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 63.73 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/RollPlot2_Sheet2sm_01.pdf\" rel=\"noopener noreferrer\">Roll Plot 2 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 59.02 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/RollPlot2_Sheet3sm_01.pdf\" rel=\"noopener noreferrer\">Roll Plot 3 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 51.37 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/RollPlot2_Sheet4sm_01.pdf\" rel=\"noopener noreferrer\">Roll Plot 4 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 46.16 MB<\/a><\/p>\n<h3>Display Boards<\/h3>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Adjacent_Roadway_Projects_11x17_01.pdf\" rel=\"noopener noreferrer\">Adjacent Roadway Projects <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 628 KB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Comments_01.pdf\" rel=\"noopener noreferrer\">Comments <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.55 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Evaluation_Matrix_01.pdf\" rel=\"noopener noreferrer\">Evaluation Matrix and Estimated Project Costs <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.48 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Existing_Roadway_Typical_Section_01.pdf\" rel=\"noopener noreferrer\">Existing Roadway Typical Section <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.78 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/FDOT_Public_Hearing_01.pdf\" rel=\"noopener noreferrer\">FDOT Public Hearings <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 871 KB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Federal_and_State_Requirements_01.pdf\" rel=\"noopener noreferrer\">Federal and State Requirements <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.90 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Formal_Presentation_01.pdf\" rel=\"noopener noreferrer\">Formal Presentation <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 862 KB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Preferred_Roadway_Typical_Sections_02.pdf\" rel=\"noopener noreferrer\">Preferred Roadway Typical Sections <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 2.08 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Project_Location_and_Study_Area_Map_01.pdf\" rel=\"noopener noreferrer\">Project Location Map <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.32 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Project_Schedule_01.pdf\" rel=\"noopener noreferrer\">Project Schedule <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.08 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Project_Video_Presentation_01.pdf\" rel=\"noopener noreferrer\">Project Video Presentation <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.01 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Title_VI_01.pdf\" rel=\"noopener noreferrer\">Title VI <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.44 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Traffic_Volumes_01.pdf\" rel=\"noopener noreferrer\">Traffic Volumes <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.04 MB<\/a><\/p>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Welcome_01.pdf\" rel=\"noopener noreferrer\">Welcome <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.41 MB<\/a><\/p>\n<h3>Additional Materials<\/h3>\n<p><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/Public_Hearing_SR50_Newsletter_20191115_FINAL.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Public Hearing Newsletter <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 3.64 MB<\/a><a class=\"info-box download\" href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-content\/uploads\/sites\/117\/pdf\/430051-1-SR50-PublicHearingScrapbook-FINAL-20200108.pdf\" rel=\"noopener noreferrer\">Public Hearing Scrapbook <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 35.27 MB<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Florida Department of Transportation (FDOT) conducted a public hearing regarding the State Road 50 (US 98\/Cortez Boulevard) Project Development &amp; Environment (PD&amp;E) Study. The public hearing was held on Tuesday, December 10, 2019 at the Brooksville Wesleyan Church, 22319<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/public-involvement\/public-hearing\/\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":69,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/pages\/88"}],"collection":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/comments?post=88"}],"version-history":[{"count":7,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/pages\/88\/revisions"}],"predecessor-version":[{"id":588,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/pages\/88\/revisions\/588"}],"up":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr50-brooksville-bypass-to-i75\/wp-json\/wp\/v2\/media?parent=88"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}