
{"id":1079,"date":"2021-07-09T15:49:54","date_gmt":"2021-07-09T15:49:54","guid":{"rendered":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/?page_id=1079"},"modified":"2024-04-02T17:42:35","modified_gmt":"2024-04-02T17:42:35","slug":"project-advisory-group-pag-meeting-2-july-15-2021","status":"publish","type":"page","link":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/public-involvement\/project-advisory-group-pag-meeting-2-july-15-2021\/","title":{"rendered":"Project Advisory Group (PAG) Meeting #2: (July 15, 2021)"},"content":{"rendered":"<p>The <strong>Project Advisory Group (PAG) Meeting<\/strong> for the SR 580 Corridor Planning and Concept Development Study was held in-person at Bayside Community Church, <a href=\"https:\/\/goo.gl\/maps\/pbeRDUdJWmREqdB16\">3380 SR 580, Safety Harbor, FL 34695.<\/a><\/p>\n<p><strong>Date:<\/strong> July 15, 2021<br \/>\n<strong>Time:<\/strong> 10 a.m. to 12:00 p.m.<\/p>\n<p>The Florida Department of Transportation (FDOT) District Seven held a PAG Meeting to provide an overview of the SR 580 Corridor Study from Alt. US 19\/SR 595\/Broadway to Tampa Road being conducted in Pinellas County, Florida.<\/p>\n<p>This project coordinated with Forward Pinellas Metropolitan Planning Organization (MPO) and the Cities of Dunedin, Clearwater, Safety Harbor, Oldsmar and unincorporated portions of Pinellas County to develop potential solutions that establish safer multimodal environment utilizing a context-sensitive approach. This study will involve a community-based evaluation to determine how best to meet the needs of current and future users, and to establish a long-term plan to guide evolution of the corridor that appropriately correlates the balance between land use and transportation planning.<\/p>\n<p>The result of the SR 580 Corridor Planning Study will include the development of a Corridor Development Plan, which will identify a range of multi-modal solutions to address the mobility needs within a context that reflects the long-term vision for the study corridor. The Corridor Development Plan will include short, mid and long-term implementation strategies that guide future development within the corridor, as well as specific improvements that can potentially be advanced in the near term though local agency participation and\/or by FDOT.<\/p>\n<p>At the PAG Meeting, the study team provided interactive roll plots for comments and input, an overview of the study process and project schedule. The project team will work cooperatively with attendees to identify community issues, goals and preferences in the project study area.<\/p>\n<h2 style=\"background-color: #003882; color: #fff; padding: 15px; margin-bottom: 0;\"><i class=\"fas fa-laptop-house mobile-device-h2-icon\"><\/i> <span class=\"mobile-device-h2-text\">Virtual GoTo Meeting<\/span><\/h2>\n<div style=\"padding: 30px; background-color: #fff; margin: 0; text-align: center;\">\n<p>Those who could not attend the in-person meeting, attended the virtual <em>GoTo Meeting<\/em> by <a href=\"https:\/\/global.gotomeeting.com\/join\/115703933\">registering here.<\/a><\/p>\n<h3>GoTo Meeeting Recording<\/h3>\n<p style=\"text-align: center;\"><video style=\"border: solid 1px #d5d5d5; max-width: 600px; text-align: center;\" src=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/SR-580-PAG2.mp4\" poster=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/SR-580-PAG2-poster.jpg\" controls=\"controls\" width=\"100%\" height=\"auto\">Your browser does not support the <code>video<\/code> element.<\/video><\/p>\n<p style=\"text-align: center;\"><a class=\"button\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/SR-580-PAG2.mp4\"><i class=\"fa fa-video-camera\" style=\"padding-right: 5px;\"><\/i>download video<\/a><\/p>\n<\/div>\n<h2 style=\"background-color: #003882; color: #fff; padding: 15px;\"><i class=\"fas fa-photo-video mobile-device-h2-icon\"><\/i> <span class=\"mobile-device-h2-text\">Project Advisory Group Meeting Materials<\/span><\/h2>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/PAG_Meeting.pdf\" rel=\"noopener noreferrer\">Presentation <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 4.89 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/RollPlot01sm.pdf\" rel=\"noopener noreferrer\">Roll Plot 1 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 5.73 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/RollPlot02Asm.pdf\" rel=\"noopener noreferrer\">Roll Plot 2 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 5.51 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/RollPlot03Asm.pdf\" rel=\"noopener noreferrer\">Roll Plot 3 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 7.86 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/RollPlot04sm.pdf\" rel=\"noopener noreferrer\">Roll Plot 4 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 5.88 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/RollPlot05Asm.pdf\" rel=\"noopener noreferrer\">Roll Plot 5 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 5.91 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/Welcome_01.pdf\" rel=\"noopener noreferrer\">Welcome Board <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 7 MB<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Project Advisory Group (PAG) Meeting for the SR 580 Corridor Planning and Concept Development Study was held in-person at Bayside Community Church, 3380 SR 580, Safety Harbor, FL 34695. Date: July 15, 2021 Time: 10 a.m. to 12:00 p.m.<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/public-involvement\/project-advisory-group-pag-meeting-2-july-15-2021\/\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":69,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/1079"}],"collection":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/comments?post=1079"}],"version-history":[{"count":25,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/1079\/revisions"}],"predecessor-version":[{"id":1225,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/1079\/revisions\/1225"}],"up":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/media?parent=1079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}