
{"id":1178,"date":"2022-04-01T17:34:46","date_gmt":"2022-04-01T17:34:46","guid":{"rendered":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/?page_id=1178"},"modified":"2024-04-02T17:42:22","modified_gmt":"2024-04-02T17:42:22","slug":"project-advisory-group-pag-meeting-3-april-27-2022","status":"publish","type":"page","link":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/public-involvement\/project-advisory-group-pag-meeting-3-april-27-2022\/","title":{"rendered":"Project Advisory Group (PAG) Meeting #3: (April 27, 2022)"},"content":{"rendered":"<!-- Added by Post\/Page Specific Custom Code plugin, thank you for using! -->\n<style>.um-map iframe {\r\n\tposition: absolute;\r\n    top: 0;\r\n    left: 0;\r\n    width: 100% !important;\r\n    height: 100% !important;\r\nborder: solid 4px #e3e2e2;\r\nbox-sizing: border-box;\r\n}\r\n\r\n.um-map {\r\nposition: relative;\r\n    padding-bottom: 50%; \/\/ This is the aspect ratio\r\n    height: 0;\r\n    overflow: hidden;\r\n}<\/style>\n<div style=\"display: none;\">\n<p>You are invited to attend and participate in the <strong>Project Advisory Group (PAG) Meeting #3<\/strong> for the SR 580 Corridor Planning and Concept Development Study. The meeting will be held in-person at <a href=\"https:\/\/goo.gl\/maps\/LDrB8shyKMdkFupL9\">Clearwater Hall Rentals, 1828 Main Street, Dunedin, FL 34698<\/a>.<\/p>\n<p><strong>Date:<\/strong> Wednesday, April 27, 2022<br \/>\n<strong>Time:<\/strong> 10:30 a.m. to 12:00 p.m.<\/p>\n<p class=\"um-map\"><iframe loading=\"lazy\" src=\"https:\/\/www.google.com\/maps\/embed?pb=!1m18!1m12!1m3!1d3522.140319558292!2d-82.75582098493105!3d28.020186782663266!2m3!1f0!2f0!3f0!3m2!1i1024!2i768!4f13.1!3m3!1m2!1s0x88c2f380dd0c5479%3A0xea6ff481134685e3!2sClearwater%20Hall%20Rentals!5e0!3m2!1sen!2sus!4v1648834746428!5m2!1sen!2sus\" width=\"600\" height=\"400\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<\/div>\n<p>The <strong>Project Advisory Group (PAG) Meeting #3<\/strong> for the SR 580 Corridor Planning and Concept Development Study was held in-person at <a href=\"https:\/\/goo.gl\/maps\/LDrB8shyKMdkFupL9\">Clearwater Hall Rentals, 1828 Main Street, Dunedin, FL 34698<\/a>.<\/p>\n<p><strong>Date:<\/strong> Wednesday, April 27, 2022<br \/>\n<strong>Time:<\/strong> 10:30 a.m. to 12:00 p.m.<\/p>\n<p>The Florida Department of Transportation (FDOT), District Seven held a third PAG Meeting to provide an update of the SR 580 Corridor Study from Alt. US 19\/SR 595\/Broadway to Tampa Road being conducted in Pinellas County, Florida. This project will be coordinated with Forward Pinellas Metropolitan Planning Organization (MPO) and the Cities of Dunedin, Clearwater, Safety Harbor, Oldsmar and unincorporated portions of Pinellas County to develop potential solutions that establish safer multimodal environment utilizing a context-sensitive approach. This study will involve a community-based evaluation to determine how best to meet the needs of current and future users, and to establish a long-term plan, to guide evolution of the corridor that appropriately correlates the balance between land use and transportation planning.<\/p>\n<p>This PAG meeting is part of the alternatives evaluation phase and is the alternatives brainstorming portion of the corridor study. At the last meeting, on July 15, 2021, the PAG assisted in identifying deficiencies along the corridor and setting the purpose and need, goals and objectives of the study. This meeting was used to share the alternatives that the team has developed to address existing deficiencies and meet the purpose and need of the study. The team received feedback from the PAG members regarding the alternative options presented.<\/p>\n<p>The format of the meeting included a brief presentation to review the deficiencies previously presented and proposed alternative options being considered as part of this Corridor planning study.<\/p>\n<h2 style=\"background-color: #003882; color: #fff; padding: 15px;\"><i class=\"fas fa-photo-video mobile-device-h2-icon\"><\/i> <span class=\"mobile-device-h2-text\">Project Advisory Group Meeting Materials<\/span><\/h2>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/PAG_Meeting_Presentation_2022_04_27.pdf\" rel=\"noopener noreferrer\">Presentation <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 7.59 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/Roadway_Segment_Improvements.pdf\" rel=\"noopener noreferrer\" download=\"\">Roadway Segment Improvements <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 50.47 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/Roll_Plot_1.pdf\" rel=\"noopener noreferrer\" download=\"\">Roll Plot 1 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 12.29 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/Roll_Plot_2.pdf\" rel=\"noopener noreferrer\" download=\"\">Roll Plot 2 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 13.05 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/Roll_Plot_3.pdf\" rel=\"noopener noreferrer\" download=\"\">Roll Plot 3 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 15.46 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/Roll_Plot_4.pdf\" rel=\"noopener noreferrer\" download=\"\">Roll Plot 4 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 9.42 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/Roll_Plot_5.pdf\" rel=\"noopener noreferrer\" download=\"\">Roll Plot 5 <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 10.41 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/Short_Term_Intersection_Improvements.pdf\" rel=\"noopener noreferrer\" download=\"\">Short Term Intersection Improvements <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 89.38 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/3\/pdf\/pag3\/Welcome.pdf\" rel=\"noopener noreferrer\">Welcome Board <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 7.02 MB<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>You are invited to attend and participate in the Project Advisory Group (PAG) Meeting #3 for the SR 580 Corridor Planning and Concept Development Study. The meeting will be held in-person at Clearwater Hall Rentals, 1828 Main Street, Dunedin, FL<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/public-involvement\/project-advisory-group-pag-meeting-3-april-27-2022\/\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":69,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/1178"}],"collection":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/comments?post=1178"}],"version-history":[{"count":18,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/1178\/revisions"}],"predecessor-version":[{"id":1224,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/1178\/revisions\/1224"}],"up":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/media?parent=1178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}