
{"id":5,"date":"2012-10-08T13:33:06","date_gmt":"2012-10-08T13:33:06","guid":{"rendered":"http:\/\/www.qcmywebsite.com\/fluid\/?page_id=2"},"modified":"2025-06-13T20:06:47","modified_gmt":"2025-06-13T20:06:47","slug":"project-overview","status":"publish","type":"page","link":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<div class=\"vct-button\" style=\"text-align: center;display:none;\"><a href=\"https:\/\/wikimapping.com\/SR-580-Corridor-Planning-and-Concept-Development-Study.html\" target=\"_blank\" rel=\"noopener noreferrer\"><img decoding=\"async\" style=\"border: 0 none;\" src=\"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-content\/uploads\/sites\/3\/2019\/08\/wikimap-tool-btn.png\" alt=\"View the WikiMap Tool\" \/><span class=\"access-read-more\"> View the WikiMap Tool<\/span><\/a><\/div>\n<div style=\"display:none\">The <a href=\"https:\/\/www.fdot.gov\/\" rel=\"noopener noreferrer\">Florida Department of Transportation (FDOT)<span class=\"access-link\"> Visit FDOT\u2019s website<\/span><\/a>, District Seven held an Elected Officials and Agencies Project Kick-off Meeting on January 14, 2021 to provide an overview of the SR 580 Corridor Planning and Concept Development Study from Alternate US 19\/SR 595\/Broadway to Tampa Road being conducted in Pinellas County, Florida &#8211; the total length of the corridor is approximately 8.5 miles. SR 580 is a major east-west corridor in Pinellas County, connecting to numerous regionally significant corridors &#8211; including Alternate US 19, Main Street, Keene Road, Belcher Road, US 19, Countryside Boulevard, McMullen Road, Philippe Parkway, Forrest Lakes Boulevard and Tampa Road.<\/div>\n<p>The Florida Department of Transportation (FDOT), District 7 conducted a corridor planning study along State Road 580 from Alternate US 19 to Tampa Road in Pinellas County \u2013 a distance of approximately 8.5 miles. Starting in the City of Dunedin SR 580 is a 4-lane divided urban arterial for almost a mile then transitions to a 4-lane undivided urban arterial to the cross street of Pinehurst Road where SR 580 adds a lane in each direction for a total of 6-lanes. The 6-lane SR 580 continues east until just west of SR 580\/Philippe Parkway where it drops a lane in each direction to a 4-lane facility and continues to the end of the project at Tampa Road. Daily traffic volumes range from 10,800 vehicles per day to 48,500 vehicles per day along the corridor in the year 2018. The corridor has sidewalks on both sides of the roadway. Bike lanes are present on both sides of SR 580 from Alternate US 19 to Countryside Boulevard. The Corridor Planning Study was completed in June 2025.<\/p>\n<div style=\"padding: 30px 0;\">\n<div><a href=\"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-content\/uploads\/sites\/3\/project-location-map-large.jpg\" rel=\"fancybox\"><img decoding=\"async\" class=\"size-full wp-image-901\" style=\"border: 0 none;\" src=\"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-content\/uploads\/sites\/3\/project-location-map-large.jpg\" alt=\"Project Location Map\" width=\"100%\" \/><\/a><\/div>\n<div style=\"background-color: #fff; padding: 10px 15px; text-align: center; font-style: italic;\">click image to view map<\/div>\n<\/div>\n<h2>Purpose<\/h2>\n<p>The purpose of this study was to identify multimodal improvements along the SR 580 corridor. SR 580 is a major east-west corridor in Pinellas County that traverses through and connects the cities of Dunedin, Clearwater, Safety Harbor and Oldsmar and provides access over Old Tampa Bay. The existing corridor is heavily developed and serves adjacent retail, commercial and residential land uses as well as local and tourist populations.<\/p>\n<h2>Need<\/h2>\n<p>Changing land use, population, and employment growth, increased multimodal users, safety and LOS concerns has led to the need of multimodal solutions to address mobility and safety needs to develop context sensitive improvements to help transform SR 580 into a multimodal urban corridor in keeping with the community context it traverses.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>View the WikiMap Tool The Florida Department of Transportation (FDOT) Visit FDOT\u2019s website, District Seven held an Elected Officials and Agencies Project Kick-off Meeting on January 14, 2021 to provide an overview of the SR 580 Corridor Planning and Concept<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-flexible-content.php","meta":{"_acf_changed":false,"footnotes":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/5"}],"collection":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/comments?post=5"}],"version-history":[{"count":67,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/5\/revisions"}],"predecessor-version":[{"id":1386,"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/pages\/5\/revisions\/1386"}],"wp:attachment":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/sr580-corridor\/wp-json\/wp\/v2\/media?parent=5"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}