
{"id":88,"date":"2012-10-10T14:52:42","date_gmt":"2012-10-10T14:52:42","guid":{"rendered":"http:\/\/www.qcmywebsite.com\/fluid\/?page_id=88"},"modified":"2020-12-01T14:54:31","modified_gmt":"2020-12-01T14:54:31","slug":"public-hearing","status":"publish","type":"page","link":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/public-involvement\/public-hearing\/","title":{"rendered":"Public Hearing"},"content":{"rendered":"<p>The public hearing for the Project Development and Environment (PD&amp;E) Re-evaluation Study along a portion of US 19 (SR 55) in Pinellas County was held on October 30, 2018. This public hearing was conducted to give interested persons an opportunity to express their views concerning the conceptual design, and social, economic, and environmental effects of the proposed improvements.<\/p>\n<p><!--\n\n\n<div style=\"margin: 20px 0; border: solid 1px #e5e5e5;\"><\/div>\n\n\n\n\n<div class=\"grid col-380\" style=\"background-color: #fff;\">\n\n\n<div style=\"background-color: #003882; padding: 20px;\"><strong style=\"color: #fff;\">Public Hearing<\/strong><\/div>\n\n\n\n\n<div style=\"padding: 20px;\"><strong>DATE:<\/strong>\nOctober 30, 2018<strong>Place:\n<\/strong><a href=\"https:\/\/goo.gl\/maps\/4Kuyyj7snqo\" target=\"_blank\" rel=\"noopener noreferrer\">Tampa Bay Regional Planning Council\n4000 Gateway Centre Boulevard, Suite 100\nPinellas Park, Florida 33782<\/a>\n\n\n<p style=\"margin-bottom: 0;\"><strong>TIME:\n<\/strong>5:30pm-6:30pm | Open House\n6:30pm | Formal Presentation<\/p>\n\n\n\n<\/div>\n\n\n<\/div>\n\n\n--><\/p>\n<p style=\"clear: both;\">The meeting began with an open house, followed by a formal public comment period at 6:30 p.m. Draft project documents and other project-related materials were displayed, and a PowerPoint presentation ran continuously during the open house. A court reporter was available to receive comments in a one-on-one setting and recorded all comments received during the formal hearing.<\/p>\n<p><!--Written comments may also be submitted during the hearing, mailed to Attn.: <strong>Kirk Bogen, P.E., FDOT Mail Station 7-500, 11201 N. McKinley Drive, Tampa, FL 33612<\/strong> or emailed to <a href=\"mailto:Kirk.Bogen@dot.state.fl.us\">Kirk.Bogen@dot.state.fl.us<\/a>. You may also submit your comments electronically on <a href=\"http:\/\/active.fdotd7studies.com\/projects\/us19-66th-to-sr690\/send-us-your-comments\/\">this project website<\/a>. All comments postmarked on or before November 9, 2018, will become part of the official public hearing record. You can attend anytime during the two-hour meeting to review project information and talk one-on-one with project team members.\n\nIf you have any questions about the project or scheduled hearing, please contact the <strong>Florida Department of Transportation Environmental Management Office<\/strong> at <strong>(813) 975-6000<\/strong> or toll free at <strong>(800) 226-7220<\/strong>.\n\n\n<div style=\"padding: 20px; background-color: #efefef;\">\n\n<strong>A Public Hearing was held:<\/strong>\n\n<strong>DATE:\n<\/strong>Thursday, July 17, 2014\n\n<strong>PLACE:\n<\/strong>Hilton Tampa Airport Westshore\nWestshore Room\n2225 North Lois Avenue\nTampa, FL 33607\n\n\n<p style=\"margin-bottom: 0;\"><strong>TIME:\n<\/strong>5:00-7:00 p.m. Open House\n6:00 p.m. Formal Presentation<\/p>\n\n\n\n<\/div>\n\n\n\n\n<div>If you have questions about the project or the hearing materials, please contact <a href=\"mailto:kirk.bogen@dot.state.fl.us\">Lilliam Escalera<\/a>, Project Manager. Her contact information is shown on the <a title=\"Contact Information\" href=\"http:\/\/active.fdotd7studies.com\/projects\/us19-66th-to-sr690\/contact-information\/\">Contact Information<\/a> page.<\/div>\n\n\n\n\n\n<hr \/>\n\n--><\/p>\n<h2>Public Hearing Materials<\/h2>\n<p><!--Project documents will be uploaded to the project website for review when they become available.\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-Draft-EIS.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Administrative Action Environmental Impact Statement (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 13.26 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-FONSI.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Administrative Action Finding Of No Significant Impact<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 2.63 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Air-Quality-Memo.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Air Quality Technical Memorandum (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 762 KB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Conceptual-Stage-Relocation-Plan.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Conceptual Stage Relocation Plan (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 24.64 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Cultural-Resource-Assessment-Survey-Redacted-v2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Cultural Resource Assessment Survey Report<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 37.80 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Geotechnical-Tech-Memo.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Geotechnical Technical Memorandum (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.05 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Contamination-Screening-Evaluation-Report.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Level I Contamination Screening Evaluation Report (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 17.32 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-LHR-Tech-Memo.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Location Hydraulic Report (LHR) Technical Memorandum (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 22.19 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Natural-Resources-Evaluation.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Natural Resource Evaluation Technical Memorandum<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 34.38 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Noise-Study-Report.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Noise Study Report (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 6.40 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-PER.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Preliminary Engineering Report (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 17.06 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Project-Traffic-Analysis-Report.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Project Traffic Analysis Report (Draft)<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 23.58 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-US-19-Final-Public-Hearing-Presentation.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Public Hearing Presentation<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 5.54 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/114005-Public-Meeting-Transcript-FDOT-10-30-2018-Original-DRAFT.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Public Hearing Transcript (Draft) <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 5.72 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-Reevaluation.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Re-evaluation Form<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 9.89 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-US_19_Concepts_from_Gandy_Blvd_to_SR_595a.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Revised Preferred Design Alternative<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 145.75 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-RollPlot-PublicHearing-48x96-Hinged-Board.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Roll Plots<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 14.70 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-SMF-Siting-Report-Redacted.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Stormwater Management Facility (SMF) Siting Report<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 37.41 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-Typical-Boards-for-Gandy-US-19-Final-102918.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Typical Sections<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 82.45 MB<\/a>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/PH-435914-1-WQIE-Checklist.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Water Quality Impact Evaluation Checklist<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 165 KB<\/a>\n\n--><!--<strong>Project Documents:<\/strong>\n\n<a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/briefing-comment-form.ppt\" target=\"_blank\" rel=\"noopener noreferrer\">Comment Form <i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 162 KB<\/a>--><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/US19-SR55-PDandE-Boards.pdf\" rel=\"noopener noreferrer\">Display Boards<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 58.21 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/435914-1-US-19-Newsletter.pdf\" rel=\"noopener noreferrer\">Public Hearing Newsletter<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 1.95 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/US-19-Final-Public-Hearing-Presentation.pdf\" rel=\"noopener noreferrer\">Public Hearing Presentation<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 4.11 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/114005-Public-Meeting-FDOT-10-30-2018-Original.pdf\" rel=\"noopener noreferrer\">Public Hearing Transcript<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 5.58 MB<\/a><\/p>\n<p><a class=\"info-box information\" href=\"https:\/\/www.fdotd7studies.com\/projects\/wp-content\/uploads\/sites\/4\/pdf\/RollPlot-PublicHearing-48x96-Hinged-Board-01.pdf\" rel=\"noopener noreferrer\">Roll Plot<i class=\"fa fa-download\" style=\"padding-left: 10px;\"><\/i> 58.42 MB<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The public hearing for the Project Development and Environment (PD&amp;E) Re-evaluation Study along a portion of US 19 (SR 55) in Pinellas County was held on October 30, 2018. This public hearing was conducted to give interested persons an opportunity<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/public-involvement\/public-hearing\/\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":69,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/pages\/88"}],"collection":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/comments?post=88"}],"version-history":[{"count":6,"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/pages\/88\/revisions"}],"predecessor-version":[{"id":693,"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/pages\/88\/revisions\/693"}],"up":[{"embeddable":true,"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/www.fdotd7studies.com\/projects\/us19-66th-to-sr690\/wp-json\/wp\/v2\/media?parent=88"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}