What is a PD&E Study?

A Project Development and Environment (PD&E) Study is a comprehensive study that evaluates social, economic and environmental effects associated with the proposed transportation improvements so that the FDOT can reach a decision on the type, location and conceptual design to meet the project’s proposed purpose and need. A No-Build Alternative, which considers leaving the roadways in their present state with routine maintenance, remains a viable alternative throughout the study. A State Environmental Impact Report (SEIR) is being prepared which summarizes the potential effects of the proposed project on the social, cultural, natural and physical environment.

A PD&E Study is required even if federal funds are not used. The Study would need to meet state requirements which are similar to federal requirement in analyzing the effects of the proposed improvements. The state equivalent document is called a State Environmental Impact Report (SEIR) or a Non-Major State Action (NMSA) and the document is signed by the FDOT District Secretary/ Delegated Authority or designee. The FHWA would not be involved in this process.

If the study results in a Build Alternative selection, the project may proceed to the next phase, which is the Design Phase.

Five Steps in the Transportation Development Process

The Transportation Development Process

  1. Long Range Planning: The FDOT and local governments conduct long-range transportation planning on an ongoing basis to identify and prioritize individual projects.
  2. Project Development and Environment Study (PD&E): During this step, design options and their social and environmental effects are examined.
  3. Design: During design, detailed construction plans are prepared.
  4. Right-Of-Way Acquisition: This phase entails acquisition of necessary right-of-way, based on the construction plans.
  5. Construction: The roadway is built during this phase.

The US 41 project is in the PD&E study phase of the FDOT’s 5-step highway development process. A PD&E study assists the FDOT in determining the location, conceptual design and social, economic and environmental effects of the proposed improvement. During the PD&E study process, feasible alternatives are developed for roadway improvement projects. These “Build” alternatives are evaluated based on environmental, engineering and socioeconomic conditions, safety needs and public input. The need for additional right-of-way for stormwater and environmental mitigation is also evaluated during the PD&E study phase. The “No Build” alternative is considered to be a viable alternative and will remain so for the duration of the study.

If the study results in a “Build” alternative being selected, the project may proceed to the next phase, which is the Project Design phase.

What’s New?

The Florida Department of Transportation (FDOT) District Seven will post a Virtual Project Update to this website in the future with the updates to the Project Development and Environment (PD&E) study for proposed improvements to US 41 in Hillsborough County, Florida.

 

>> read more

Join the Conversation!

We want your comments and suggestions. Now is the time to get involved! You may send us your comments via the Comments page on this web site so that they can be considered as part of this study.

 

>> read more

Contact Information

For more information or to comment, please contact:

 

Anna Geismar, FDOT Project Manager
Florida Department of Transportation, District Seven

11201 N. Malcolm McKinley Drive, MS 7-500
Tampa, FL 33612

(813) 975-6634
(800) 226-7220
anna.geismar@dot.state.fl.us


For media inquiries, please contact:

 

Kris Carson, Public Information Officer
Florida Department of Transportation, District Seven
11201 N. Malcolm McKinley Drive
Tampa, FL 33612-6456

(813) 975-6202
(800) 226-7220
kristen.carson@dot.state.fl.us


Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact Jensen Hackett, at (813) 975-6283, toll free at (800) 226-7220, or by email at: jensen.hackett@dot.state.fl.us, or contact Stefan Kulakowski, at (850) 414-4742, toll free at (888) 374-FDOT, or by email at: stefan.kulakowski@dot.state.fl.us.


Si usted tiene preguntas o comentarios o si simplemente desea mas informacion sobre este proyecto, favor de ponerse en contacto con nuestro representante, el señor Manuel Flores, al teléfono (813) 975-6279 o correo electrónico manuel.flores@dot.state.fl.us.