• Completed Study

Project Advisory Group (PAG) Meeting #2: (July 15, 2021)

The Project Advisory Group (PAG) Meeting for the SR 580 Corridor Planning and Concept Development Study was held in-person at Bayside Community Church, 3380 SR 580, Safety Harbor, FL 34695.

Date: July 15, 2021
Time: 10 a.m. to 12:00 p.m.

The Florida Department of Transportation (FDOT) District Seven held a PAG Meeting to provide an overview of the SR 580 Corridor Study from Alt. US 19/SR 595/Broadway to Tampa Road being conducted in Pinellas County, Florida.

This project coordinated with Forward Pinellas Metropolitan Planning Organization (MPO) and the Cities of Dunedin, Clearwater, Safety Harbor, Oldsmar and unincorporated portions of Pinellas County to develop potential solutions that establish safer multimodal environment utilizing a context-sensitive approach. This study will involve a community-based evaluation to determine how best to meet the needs of current and future users, and to establish a long-term plan to guide evolution of the corridor that appropriately correlates the balance between land use and transportation planning.

The result of the SR 580 Corridor Planning Study will include the development of a Corridor Development Plan, which will identify a range of multi-modal solutions to address the mobility needs within a context that reflects the long-term vision for the study corridor. The Corridor Development Plan will include short, mid and long-term implementation strategies that guide future development within the corridor, as well as specific improvements that can potentially be advanced in the near term though local agency participation and/or by FDOT.

At the PAG Meeting, the study team provided interactive roll plots for comments and input, an overview of the study process and project schedule. The project team will work cooperatively with attendees to identify community issues, goals and preferences in the project study area.

Virtual GoTo Meeting

Those who could not attend the in-person meeting, attended the virtual GoTo Meeting by registering here.

GoTo Meeeting Recording

download video

Project Advisory Group Meeting Materials

Presentation 4.89 MB

Roll Plot 1 5.73 MB

Roll Plot 2 5.51 MB

Roll Plot 3 7.86 MB

Roll Plot 4 5.88 MB

Roll Plot 5 5.91 MB

Welcome Board 7 MB

Study Complete

The Corridor Study was presented to the Forward Pinellas MPO in May 2025 and the report was completed. See Project Documents for the final report.

 

View the Project Documents Page View Project Documents

Contact Information
For more information or to comment, please contact:

 

Planning & Environmental Management Office (PLEMO)
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
M.S. 7-500
Tampa, FL 33612-6456

 

Phone: (813) 975-6000
Toll Free: (800) 226-7220

 

Comuniquese Con Nosotros
Si usted tiene preguntas o comentarios, o si simplemente desea más información sobre este proyecto, favor ponerse en contacto con el señor Manuel Flores, al teléfono (813) 975-6279 o al correo electrónico manuel.flores@dot.state.fl.us.