• Completed Study

Project Final Documents

Proposed Roadway Views

Typical Section Six-Lane Arterial SR 686 from SR 688 (Ulmerton Road) to US 92 (Gandy Boulevard)

Typical Section Six-Lane Arterial SR 686 from SR 688 (Ulmerton Road) to US 92 (Gandy Boulevard)

Proposed Typical Section Expressway SR 686 Expressway from 49th Street to 118th Avenue

Proposed Typical Section Expressway SR 686 Expressway from 49th Street to 118th Avenue

Proposed Typical Section Expressway Roosevelt Boulevard and Airport Entrance

Proposed Typical Section Expressway Roosevelt Boulevard and Airport Entrance

Proposed Typical Section Grade Separation – 4 Steel Box Girders

Proposed Typical Section Grade Separation – 4 Steel Box Girders

Proposed Typical Section Grade Separation – Steel Plate Girder

Proposed Typical Section Grade Separation – Steel Plate Girder

Proposed Typical Section Grade Separation – Prestressed Girders

Proposed Typical Section Grade Separation – Prestressed Girders

Documents

Engineering Report

Environmental Determination

Interchange Justification Report

PD&E Concepts

Traffic Addendum

Contact Information
For more information or to comment, please contact:

Environmental Management Office
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
M.S. 7-500
Tampa, FL 33612-6456

Phone: (813) 975-6000
Toll Free: (800) 226-7220

Comuniquese Con Nosotros
Si usted tiene preguntas o comentarios, o si simplemente desea más información sobre este proyecto, favor ponerse en contacto con el señor Manuel Flores, al teléfono (813) 975-4248 o al correo electrónico manuel.flores@dot.state.fl.us