Project information and documents are provided below.
They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.
Air Quality Technical Memorandum 1.91 MB Approved Design Change Re-evaluation (Approved 10/30/19) 1.70 MB Bridge Replacement Memorandum 28 KB Comments and Coordination Report 34 MB Conceptual Stage Relocation Plan 32.33 MB Geotechnical Technical Memorandum 6.58 MB Level I Contamination Screening Evaluation Report 23.11 MB Location Hydraulic Report (LHR) Technical Memorandum 23.70 MB Natural Resource Evaluation Technical Memorandum 30.43 MB Noise Study Report 11.44 MB Preferred Concept Plans 7.5 MB Preliminary Engineering Report 16.58 MB Project Commitment Record Form 59 KB Project Traffic Analysis Report 8.48 MB Project Traffic Analysis Report Appendices 15.74 MB Project Traffic Assumption Form 287 KB Public Hearing Scrapbook 42.4 MB Public Hearing Transcript 5.58 MB Public Involvement Plan 1.1 MB Stormwater Management Facility (SMF) Siting Report 41.55 MB Utility Assessment Package 54.19 MB Water Quality Impact Evaluation Checklist 280 KBPrevious US 19 (SR 55) Project Development & Environment Study
From State Road 694 (Gandy Boulevard) in Pinellas County to State Road 595 (Alternate US 19)
WPI Seg. No.: 7116860 | Pinellas and Pasco Counties, Florida
