• Completed Study

Project Documents

Project information and documents are provided below.

They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.

Air Quality Technical Memorandum 1.91 MB Approved Design Change Re-evaluation (Approved 10/30/19) 1.70 MB Bridge Replacement Memorandum 28 KB Comments and Coordination Report 34 MB Conceptual Stage Relocation Plan 32.33 MB Geotechnical Technical Memorandum 6.58 MB Level I Contamination Screening Evaluation Report 23.11 MB Location Hydraulic Report (LHR) Technical Memorandum 23.70 MB Natural Resource Evaluation Technical Memorandum 30.43 MB Noise Study Report 11.44 MB Preferred Concept Plans 7.5 MB Preliminary Engineering Report 16.58 MB Project Commitment Record Form 59 KB Project Traffic Analysis Report 8.48 MB Project Traffic Analysis Report Appendices 15.74 MB Project Traffic Assumption Form 287 KB Public Hearing Scrapbook 42.4 MB Public Hearing Transcript 5.58 MB Public Involvement Plan 1.1 MB Stormwater Management Facility (SMF) Siting Report 41.55 MB Utility Assessment Package 54.19 MB Water Quality Impact Evaluation Checklist 280 KB

Previous US 19 (SR 55) Project Development & Environment Study

From State Road 694 (Gandy Boulevard) in Pinellas County to State Road 595 (Alternate US 19)
WPI Seg. No.: 7116860 | Pinellas and Pasco Counties, Florida

Administrative Action Draft Environmental Impact Statement 1 40.8 MB Administrative Action Draft Environmental Impact Statement 2 10.4 MB Administrative Action Finding Of No Significant Impact 1 7.7 MB Administrative Action Finding Of No Significant Impact 2 2.6 MB Design Alternatives Report Addendum 1.5 MB Final Report Elevated Freeway Alternative 1.9 MB Hazardous Waste Site Inventory Report 4.6 MB Location Hydraulic Report 426 KB Permit Coordination Report 8.7 MB Revised Preferred Design Alternative for U.S. 19 369 MB

Previous US 19 (SR 55) Re-evaluation Documents

Advance to Construction Authorization (April 30, 2009) 709 KB Advance to Construction Authorization (June 1, 2011) 3.2 MB Construction Authorization (November 6, 2000) 573 KB Construction Authorization (August 30, 2005) 568 KB Design Authorization (March 3, 1994) 356 KB Design and Construction Authorization (June 29, 1995) 344 KB Federally Funded Construction Authorization (March 6, 2006) 1.1 MB Federally Funded Right-of-Way Acquisition (September 24, 2003) 189 KB Federally Funded Right-of-Way Acquisition (March 31, 2004) 720 KB Federally Funded Right-of-Way Authorization (May 3, 2006) 618 KB Right of Way Re-evaluation (September 8, 2015) 647 KB
Upcoming Meetings

There are no upcoming meetings.

 

>> read more

What’s New?

The Florida Department of Transportation (FDOT) completed a Project Development & Environment (PD&E) Re-evaluation Study for proposed improvements to US 19 (SR 55) from 66th Avenue North to SR 690 / 118th Avenue North in Pinellas County. This project is a re-evaluation of a PD&E study originally completed in 1990. Re-evaluations verify that the study results are in compliance with applicable Federal and State laws before moving into a production phase for the area. This re-evaluation serves as a check on the commitments made by FDOT during the original study process. The re-evaluation documents compliance with Federal laws and any changes that may have occurred since the approval of the original final recommendations.

 

>> read more

Project Schedule

The US 19 PD&E Re-evaluation Study began in February 2016. The project activities included collecting information, developing roadway improvement alternatives and evaluating the potential environmental and social effects of the “no-build” and “build” alternatives.

 

A public hearing was conducted on Tuesday, October 30, 2018 from 5:30 p.m. to 7:30 p.m. at the Tampa Bay Regional Planning Council.

 

On October 30, 2019, FDOT’s Office of Environmental Management (OEM) approved the US 19 PD&E Re-evaluation.

 

>> read more

Contact Information

For more information or to comment on the completed environmental phase of the project, please contact:

 

Environmental Management Office
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
MS 7-500
Tampa, FL 33612-6456
(813) 975-6000
(800) 226-7220


For issues related to the final design of this project, please contact:

 

Liz Winters, Design Project Manager
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
MS 7-600
Tampa, FL 33612-6456
(813) 975-6169
(800) 226-7220
elizabeth.winter@dot.state.fl.us


For all other inquiries related to this project, please contact:

 

Kristen Carson, Public Information Director
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
MS 7-110
Tampa, FL 33612-6456
(813) 975-6060
(800) 226-7220
kristen.carson@dot.state.fl.us


Para preguntas en Español

Si usted tiene preguntas o comentarios, o si simplemente desea más información sobre este proyecto, favor ponerse en contacto con el señor Manuel Flores, al teléfono (813) 975-6279 o al correo electrónico manuel.flores@dot.state.fl.us.