| Schedule | |
|---|---|
| PD&E Study Public Hearing | 12/10/2015 |
| Pasco County 54/56 Vision Study | 2015-2017 |
| Feasibility Study (Alternative Analysis) | 2017-2023 |
| PD&E Study Resumes | 2023-2025 |
| Public Hearing | 03/25/2025 |
| Virtual Project Update | 01/28/2026 through 02/18/2026 |
| Design | 2025-2027 |
| Right of Way Acquisition | 2028-2030 |
| Construction | Currently Unfunded |