Concept Plans
Concept Plans – US 41 at SR 54 (DDI) 419182-1 8 MB
Final Reports
Preliminary Engineering Report (PER) 20 MB
Environmental Document – Type 2 Categorical Exclusion (CE) 15 MB
Cultural Resource Assessment Survey (CRAS) 93.6 MB
Cultural Resource Assessment Survey (CRAS) Addendum 42.5 MB
Contamination Screening Evaluation Report (CSER) 11 MB
Location Hydraulics Report (LHR) 116 MB
Natural Resources Evaluation – Technical Memorandum (NRE) 25 MB
Pond Siting Report (PSR) – Report Only 348 KB
Pond Siting Report (PSR) – Appendix only 1012 MB
Project Traffic Analysis Report (PTAR) 14 MB
Public Involvement Plan (PIP) 1 MB