The US 301 Project Development & Environment (PD&E) study process provides opportunities for the public to view information about the project and to comment on the proposed improvements. Public involvement activities will continue throughout the duration of the project. Project information and documents are uploaded to the project website for review when they become available.
They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.
Final Project Documents
Comments and Coordination Report 18.10 MB
Contamination Screening Evaluation Report 165.53 MB
Conceptual Stage Relocation Plan 7.57 MB
Cultural Resource Assessment Survey 35.88 MB
Cultural Resource Assessment Survey Addendum 27.08 MB
Cultural Resource Assessment Survey Addendum Technical Memorandum 12.78 MB
Design Traffic Technical Memorandum 9.69 MB
Design Traffic Technical Memorandum Final Appendices 73.44 MB
Location Hydraulic Report 7 MB
Natural Resources Evaluation 25.22 MB
Natural Resources Evaluation Addendum 16.87 MB
Preliminary Engineering Report 47.94 MB
Preliminary Stormwater Management Facility Report 38.05 MB
Public Involvement Plan 1.19 MB