• Completed Study

Public Involvement

Public involvement is one of the most important elements of a PD&E study. It is very important for the public to provide comments to FDOT about the proposed US 301 improvements. There are many ways for you to stay involved, such as small group meetings and a public hearing. Project newsletters are mailed to all property owners within the study area as well as elected/appointed public officials at key points in the study.

FDOT will print and mail newsletters three times during this study:

  1. Project kickoff (mailed out on September 15, 2014)
  2. Prior to the public hearing hearing (scheduled for March 1, 2016)
  3. End of the study (Summer 2018)

The mailing list includes:

  • All property owners located within 300 feet
  • Neighborhood and civic associations
  • Local elected and appointed public officials
  • Local, regional, and state agencies
  • Anyone requesting to be included on the mailing list

Upon request, the study team may also make presentations to local officials as well as hold casual “small group” meetings with local and neighborhood groups. FDOT will provide information on the project status and illustrations of the proposed build alternatives at these meetings. Anyone who wishes to comment about the project is encouraged to do so.

Please check this page periodically for current information regarding meeting schedules and meeting displays and graphics.

Public Hearing

The Florida Department of Transportation (FDOT), District Seven held a public hearing for a Project Development and Environment (PD&E) study for proposed improvements to US 301 (SR 43) in Hillsborough County, Florida on March 1, 2016. This public hearing was held to allow interested persons an opportunity to provide comments concerning the location, conceptual design, and social, economic, and environmental effects of widening US 301 from SR 60 (Adamo Drive) to I-4 (SR 400), a distance of approximately 3.3 miles. The widening of US 301 is proposed as a six lane divided roadway with pedestrian and bicycle facilities.


Public Hearing Displays

FDOT District 7 Hearing video for US 301 from SR 60 to I-4

Alternatives Comparison Matrix 304 KB

Bridge Typical Section 1 282 KB

Bridge Typical Section 2 257 KB

Project Location Map 677 KB

Project Schedule 308 KB

Proposed Roadway Alignment 5.30 MB

Public Hearing Newsletter 747 KB

Roadway Typical Section 1 311 KB

Roadway Typical Section 2 314 KB

Contact Information
For more information or to comment, please contact:

Environmental Management Office
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
M.S. 7-500
Tampa, FL 33612-6456

Phone: (813) 975-6000
Toll Free: (800) 226-7220

Comuniquese Con Nosotros
Si usted tiene preguntas o comentarios, o si simplemente desea más información sobre este proyecto, favor ponerse en contacto con el señor Manuel Flores, al teléfono (813) 975-4248 o al correo electrónico manuel.flores@dot.state.fl.us