The US 41 / SR 54 Project Development & Environment (PD&E) study process will provide many opportunities for the public to view information about the project and to comment on the proposed improvements. Project information and documents will be uploaded to the project website for review when they become available.
They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.
2nd Public Hearing Documents (2025)
Conceptual Stage Relocation Plan (CSRP) – Draft 132.06 MB
Contamination Technical Memorandum – Draft 7 MB
Cultural Resource Assessment Survey (CRAS) 140.64 MB
US 41 (SR 45) at SR 54 Feasibility Study (2024) – Draft 158 MB
Geotechnical Technical Memorandum – Draft 8.21 MB
Location Hydraulics Report (LHR) – Draft 735.31 MB
Natural Resources Evaluation (NRE) – Draft 133.80 MB
Noise Study Report (NSR) – Draft 15.97 MB
Pond Siting Report (PSR) – Draft 871.53 MB
Preliminary Engineering Report (PER) – Draft 129.98 MB
Project Traffic Analysis Report (PTAR) – Draft 9.16 MB
Public Involvement Plan (PIP) – Draft 1 MB
Safety Analysis Memo – Draft 5.17 MB
Type 2 Categorical Exclusion – Draft 120.50 MB
Utility Assessment Package – Draft 112.29 MB
1st Public Hearing Documents (2015)
Air Quality Technical Memorandum 279 KB
Final Conceptual Stage Relocation Plan (Draft) 5.60 MB
Final Draft Level 1 Contamination Screening Evaluation Report (CSER) 10.95 MB
Location Hydraulics Report (Draft) 4.93 MB
Noise Study Report (Draft) 15.37 MB
Preliminary Engineering Report (Draft) 11.63 MB
Technical Traffic Memorandum 21.39 MB
Type 2 Categorical Exclusion Determination Form 5.36 MB