Proposed Bridge Views
Proposed Bridge Typical Section at I-75 over Fowler Avenue and Ramp A-1
Proposed Bridge Typical Section at I-75 over Cowhouse Creek
Proposed Bridge Typical Section at I-75 over 127th Avenue
Proposed Bridge Typical Section at I-75 over Fletcher Avenue
Proposed Bridge Typical Section at I-75 over Hillsborough River
Proposed Bridge Typical Section at I-75 over Bruce B. Downs Boulevard
Proposed Bridge Typical Section at I-75 over Cypress Creek (Hillsborough County)
Proposed Bridge Typical Section at I-275/I-75 Interchange – Option 1
Proposed Bridge Typical Section at I-275/I-75 Interchange – Option 3
Proposed Roadway Views
Proposed Six-Lane Typical Section with Auxiliary Lanes – Southern Portion of Segment B from Fletcher Avenue to 3000′ North of the Hillsborough River
Proposed Six-Lane Typical Section with Auxiliary Lanes – North Portion of Segment B & C from 3000′ North of the Hillsborough River to Bruce B. Downs Boulevard
Proposed Six-Lane Typical Section – Segment D from Bruce B. Downs Boulevard to the I-75/I-275 Interchange
Proposed Six-Lane Typical Section with Auxiliary Lanes (Options 1 & 2) – Segment E from I-75/I-275 Interchange to SR 56
Proposed Six-Lane Typical Section with Auxiliary Lanes (Option 3) – Segment E from I-75/I-275 Apex to the SR 56 Exit Ramp
Proposed Six-Lane Typical Section with Auxiliary Lanes – Segment F in the Vicinity of the Airport from SR 56 to South of CR 54
Proposed Six-Lane Typical Section with Auxiliary Lanes – Segment F North and South of the Airport from SR 56 to South of CR 54
Documents
Air Quality Report
Comments and Coordination Report
Contamination Screening Evaluation Report
Cultural Resources Assessment Survey
Endangered Species Technical Memorandum
Location Hydraulic Report
Traffic Noise Memorandum
Preliminary Engineering Report
Public Hearing Scrapbook
Traffic Technical Memorandum
Type 2 Categorical Exclusion
Wetland Evaluation Report