US 41/SR 45/S 50th St @ CSX Grade Separation Design Change Reevaluation process provides opportunities for the public to view information about the project and to comment on the proposed improvements. Public involvement activities will continue throughout the duration of the study. Project information and documents are uploaded to the project website for review when they become available.
They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.
Conceptual Stage Relocation Plan (CSRP) 150.9 MB
Contamination Screening Evaluation Report (CSER) 60.06 MB
Cultural Resources Assessment Survey (CRAS) – Mainline 38.01 MB
Location Hydraulics Report (LHR) 21.73 MB
Natural Resources Evaluation Report (NRE) 21.70 MB
Noise Study Report (NSR) 45.43 MB
Pond Siting Report (PSR) 222.48 MB
Preferred Alternative Concept Plan 17.30 MB
Preliminary Engineering Report (PER) 71.44 MB
Project Traffic Analysis Report (PTAR) 37.70 MB
Public Involvement Plan 3.24 KB
Re-evaluation – Environmental Document 4.79 MB