• Completed Study

Final Project Documents

he attached documents are in PDF format; therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader Get Adobe Acrobat Reader, which is available for Windows and Mac.

Second Public Hearing Study Documents (January 2022)

Cultural Resource Assessment Survey Report (CRAS) 16.15 MB

Cultural Resource Assessment Survey Report for Pond Sites 19.94 MB

Contamination Screening Evaluation Report (CSER) – Draft 158.72 MB

Historic Resources Survey Update (HRSU) 18.52 MB

Location Hydraulic Report (LHR) – Draft 20.11 MB

Natural Resources Evaluation (NRE) 41.65 MB

Noise Study Report (NSR) – Draft 31.24 MB

Preliminary Engineering Report (PER) – Draft 61.50 MB

Pond Siting Report (PSR) – Draft 226.12 MB

Project Traffic Analysis Report (PTAR) – Vol 1 of 2 5.08 MB

Project Traffic Analysis Report (PTAR) – Vol 2 of 2 60.73 MB

Type 2 Categorical Exclusion – Draft 1.46 MB

WQIE Checklist 27 KB

First Public Hearing Study Documents (April 2010)

To view the draft study documents that were available for the First Public Hearing in April 2010, please click here.

Public Hearing Study Documents (April 2010)

Below are draft study documents that were available for the First Public Hearing in April 2010 and have now been superseded by those listed above for the Second Public Hearing in January 2022.

Study Documents (419235-2)

Project Development Engineering Report (PDER) – Draft 38.76 MB

Project Development Engineering Report (PDER) Appendix B – Draft 60.48 MB

Project Development Summary Report (PDSR) – Draft 10.63 MB

Project Development Summary Report (PDSR) Appendix A – Draft 94.54 MB

Location Hydraulics Report (LHR) – Draft 1.39 MB

Pond Sizing Technical Memorandum – Draft 8.92 MB

Cultural Resource Assessment Survey (CRAS) 10.21 MB

Air Quality Technical Memorandum (AQM) – Draft 5.47 MB

Contamination Screening Evaluation Report (CSER) – Draft 16.47 MB

Contamination Screening Evaluation Report (CSER) Appendix B – Draft 1.28 MB

Noise Study Report (NSR) – Draft 2.50 MB

Wetland Evaluation and Biological Assessment Report (WEBAR) – Draft 19.54 MB

Air Quality Technical Memorandum 367 KB Comments and Coordination Report 118.6 MB Cultural Resource Assessment Survey Report 16.2 MB Cultural Resource Assessment Survey Technical Memorandum 7.5 MB Contamination Screening Evaluation Report 144.7 MB Farmland Conversion Impact Rating for Corridor Type Projects 292.8 KB Preliminary Engineering Report 56.8 MB Historic Resources Survey Update Technical Memorandum 18.6 MB Location Hydraulic Report 22.4 MB Natural Resources Evaluation 41.7 MB Noise Study Report 22.1 MB Pond Siting Report 139.2 MB Project Traffic Analysis Report (Vol 1 of 2) 5.1 MB Project Traffic Analysis Report (Vol 2 of 2) 60.8 MB Section 4(f) Resources Technical Memorandum 16.2 MB Administrative Action Type 2 Categorical Exclusion 38.2 MB WQIE Checklist 27.8 KB
Contact Information
For more information about this project, please contact:

Environmental Management Office
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
M.S. 7-500
Tampa, FL 33612-6456

Phone: (813) 975-6000
Toll Free: (800) 226-7220

Comuniquese Con Nosotros
Si usted tiene preguntas o comentarios, o si simplemente desea más información sobre este proyecto, favor ponerse en contacto con el señor Manuel Flores, al teléfono (813) 975-6279 o al correo electrónico manuel.flores@dot.state.fl.us.