• Completed Study

Project Final Documents

The PD&E study process provides opportunities for the public to view information about the project and to comment on the proposed improvements.

The study’s supporting documents for the public are available for public review from September 17, 2021 through October 13, 2021, at the FDOT District 7, 11201 N. McKinley Drive, Tampa, FL 33612 during normal operating hours.

Project information and documents will be uploaded to the project website for review when they become available.

They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.

Administrative Action Type 2 Categorical Exclusion 9.86 MB

Comments and Coordination Report 5.26 MB

Concept Plans 5.3 MB

Contamination Screening Evaluation Report 46.3 MB

Cultural Resource Assessment Survey 7.75 MB

Cultural Resource Assessment Survey – Addendum Updated 5.58 MB

Cultural Resource Assessment Survey – Pond Addendum 28.5 MB

Final Preliminary Engineering Report 34.5 MB

Interchange Modification Report 23.2 MB

Location Hydraulics Memorandum 50.9 MB

Natural Resources Evaluation 19.7 MB

Natural Resources Evaluation – Update Tech Memo 31.7 MB

Noise Study Report 2.08 MB

Pond Siting Report 136 MB

Project Traffic Analysis Report 50.8 MB

Water Quality Impact Evaluation 608 KB

Contact Information
For more information about this project, please contact:

Environmental Management Office
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
M.S. 7-500
Tampa, FL 33612-6456

Phone: (813) 975-6000
Toll Free: (800) 226-7220

Comuniquese Con Nosotros
Si usted tiene preguntas o comentarios, o si simplemente desea más información sobre este proyecto, favor ponerse en contacto con el señor Manuel Flores, al teléfono (813) 975-6279 o al correo electrónico manuel.flores@dot.state.fl.us.