Proposed Roadway Views
- Morningside Dr. US 98 Bypass Segment D Alternative 1 (High Speed Urban Alternative)
- Morningside Dr. to US 98 Bypass Segment D Alternative 2 (Low-Speed Urban Alternative)
- North Kossik Rd. to Morningside Dr. Segment B and C Alternative 1 (High Speed Urban Alternative)
- North Kossik Rd. to North Wire Rd. and North Centennial Rd. to Morningside Dr. Segment B and C Alternative 2 (Rural Alternative)
- North Wire Rd. to North Centennial Rd. Segment B Alternative 2A (Rural Alternative Shoulder Gutter Section)
- South CR 54 to North Kossik Rd. Segment A Alternative 1 (High-speed Urban Alternative)
- South CR 54 to North Kossik Rd. Segment A Alternative 2 (Low-speed Urban Alternative)
Documents
Final Comments and Coordination Report
Final Cultural Resource Assessment Survey Report
Final Contamination Screening Evaluation Report
Final Location Hydraulics Report
Final Project Development Summary Report
Final Stormwater Management Facilities Report
Final Traffic Technical Memorandum
Final Traffic Technical Memorandum Appendices
Final Wetlands Evaluation and Biological Assessment Report (WEBAR)