• Active Study

1st Public Hearing (May 2010)

A 1st public hearing for the I-75 PD&E studies was held by the FDOT on May 6, 2010. The public hearing was conducted at the following location and time:

Date: Thursday, May 6, 2010
Time: 5:00 p.m. to 7:00 p.m.
6:00 p.m.: Formal Presentation
and Public Comment Period
Place: Florida State Fairgrounds
Florida Center Building
4800 US Highway 301
Tampa, FL 33610

Maps, drawings, and other pertinent information depicting the project’s alignment and proposed improvements were available for public review from Thursday, April 15 through Tuesday, May 18, 2010, at the Florida Department of Transportation District Seven office. These documents were also on display at the Ruskin Branch Library, the Brandon Regional Library and the Temple Terrace Public Library.

A project newsletter has been distributed to announce the public hearing to nearby landowners and individuals on the project mailing list. The concepts that were illustrated at the alternatives public workshop have been further evaluated. The results of the evaluation and the recommended alternative was presented at the public hearing. FDOT representatives were available to answer any questions that you had regarding the project.

The hearing commenced at 5:00 p.m. with an open-house format consisting of project displays, a project website station, and a brief video on continual loop. There were also stations where the public could gain information on the FDOT right-of-way and property acquisition process, the FDOT 511 hotline, and the Tampa Bay Area Regional Transportation Authority (TBARTA). A court reporter was also present for the duration of the meeting to record public comments. At 6:00 p.m. a formal presentation was given followed by public oral comments. The hearing had 42 attendees. No elected officials were in attendance. Four citizens completed speaker cards and gave their official comments. Four comment sheets were also completed. The comment period ended on April 17, 2010. A total of 32 comments were received prior to, during and after the public hearing.

Public Hearing Presentation

Public Hearing Presentation Video

download video

Public Hearing Materials

Public Hearing Newsletter (mailed April 2010) 1.32 MB

Public Hearing Transcript 108 KB

Welcome Board 687 KB

Comments Board 781 KB

Citations Board 375 KB

Traffic Board 1.13 MB

Key Milestones 517 KB

Southern Study Potential Section 4(f) Involvement 1.22 MB

Southern Study Recommended Build Alternative 623 KB

Southern Study Evaluation Matrix 691 KB

Southern Study Road to South of SR 674 141.77 MB

Southern Study From South of SR 674 to North of Big Bend Road 148.51 MB

Southern Study From North of Big Bend Road to South of US 301 98.10 MB

Southern Study Interim Improvements Big Bend Road Interchange 969 KB

Southern Study Interim Improvements SR 674 Interchange 1.05 MB

Northern Study Recommended I-75 Typical Section Board 780 KB

Northern Study Existing Typical Sections Segment 1 2.11 MB

Northern Study Existing Typical Sections Segment 2 1.17 MB

Northern Study Existing Typical Sections Segment 3 1.34 MB

Northern Study Evaluation Matrix 1.25 MB

Northern Study Segment 1 41.32 MB

Northern Study Segment 2 18.76 MB

Northern Study Segment 3 39.88 MB

Northern Study Interim Improvement Alternative 1A 6.15 MB

Northern Study Interim Improvement Alternative 2A 7.29 MB

Northern Study Interim Improvement Alternative 2B 6.76 MB

Northern Study Interim Improvement Alternative 3A 6.77 MB

Newspaper Ad (English Version)

published in the Tampa Tribune and in the Bradenton Herald on April 19 and 29, 2010
Newspaper Ad (English Version) 71 KB

Newspaper Ad (Spanish Version)

published in Centro Tampa on April 16 and 30, 2010
Newspaper Ad (Spanish Version) 73 KB

What’s New?

The Florida Department of Transportation (FDOT) has conducted two Project Development and Environment (PD&E) studies that are considering improvement options on Interstate 75 (I-75) (State Road 93A) in Manatee and Hillsborough Counties.

Send Us Your Comments

Your comments are very important. You may send us your comments via the Comments page on this website so that they can be considered as part of this study.

 

View the Comment Form Send Us Your Comments

Project Schedule

The I-75 PD&E studies began in spring 2008. The development and evaluation of the widening alternatives was completed in the summer of 2010. The FDOT held the I-75 alternatives public workshops on June 15, 2009 and June 17, 2009, and a 1st public hearing was held on Thursday, May 6, 2010. A second public hearing took place on January 27, 2022.

 

View the Project Schedule Read More

Contact Information

For more information or to comment, please contact:

 

Ashley Henzel, P.E., Project Manager
Florida Department of Transportation, District Seven
11201 N. McKinley Drive M.S. 7-500
Tampa, FL 33612-6456

(813) 975-6433
(800) 226-7220
ashley.henzel@dot.state.fl.us

or

Amber Russo, P.E.
Florida Department of Transportation, District Seven
11201 N. McKinley Drive M.S. 7-500
Tampa, FL 33612-6456

(813) 975-6260
(800) 226-7220
amber.russo@dot.state.fl.us


For media inquiries, please contact:

 

Kris Carson, Public Information Officer
Florida Department of Transportation, District Seven
11201 N. McKinley Drive M.S. 7-500
Tampa, FL 33612-6456

(813) 975-6060
(800) 226-7220
kristen.carson@dot.state.fl.us


Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation service (free of charge) should contact Title VI Coordinator Roger Roscoe, at (813) 975-6411 or (800) 226-7220 or email: roger.roscoe@dot.state.fl.us.


Comuniquese Con Nosotros
Si usted tiene preguntas o comentarios o si simplemente desea mas informacion sobre este proyecto, favor de ponerse en contacto con nuestro representante, el señor Manuel Flores, al teléfono (813) 975-4248 o correo electrónico manuel.flores@dot.state.fl.us.